Description

Machine main features

  1. PCB transport and clamping system
  • The PCB loading direction can be selected and combined freely;
  • Unique crafted internal gear conveyor belt to prevent jamming;
  • Programmable transport speed control makes PCB stop more precise;
  • Adopt flexible side clamps and segmented supports to effectively clamp the PCB to ensure a fully balanced contact between the PCB and the steel mesh.
  1. Stencil positioning system
  • Arch bridge-shaped suspension hanging direct-contact scraper;
  • The size of steel mesh is universal, with goof and wide applicability;
  • Segmented fixed steel mesh frame.
  1. Scraper system
  • Programmable suspension self-adjusting stepper motor drives print head;
  • Bilateral double-slider positioning type slide rail structure ensures the accuracy and smoothness of running before and after printing;
  • Slide rail type scraper system, improve operation stability and prolong time;
  • Embedded scale, never fall off.
  1. Operation system
  • Easy to learn and easy to use friendly operation interface;
  • With good human-machine dialogue function;
  • Make program files with teaching and navigation functions, with prompts for each step;
  • One key switch between Chinese and English, with operation log, fault record analysis and diagnosis.
  1. Image and optical system
  • X,Y axis adopts high-precision grinding ball screw, driven by servo motors at both side;
  • The polarizer is added inside, and the mark different shapes is automatically and accurately grasped, and the upper, lower and coaxial three way uniform light sources.

Model

ET-5235

PCB size

Max:520*350 mm

Min:50*50 mm

Transport height

900±20mm

Transport speed

Max 1200mm/s programmable

Printing accuracy

±0.025mm

Cycle time

≤9s(Excluding printing&cleaning)

Control method

PC control

PCB transfer overhead height

10mm

Squeegee speed

6~300mm/sec

Cleaning system

Dry、Wet、Vacuum(Programmable)

Product changeover

<5Min

Stencil separation speed

0.1~20mm/sec Programmable

Machine main part

Our products had exported to more than 30 countries and regions, including South Korea, India, Vietnam, Tunisia, Egypt,Turkey, Russia, Brazil etc. And here are some of our big customers:

SURYA, POLYCAB, FIEM, RK, GK, TECHNO LED, CALCOM, ACK , KENDAL, RangDong,  UNISTAR, and so on.

Our company has participated in various exhibitions in foreign countries, including India Mumbai Exhibition, India Delhi Exhibition, Egypt Exhibition, Turkey Exhibition, Pakistan Exhibition, etc.

Maintenance period 1 year

One year warranty during warranty any parts that need to be repaired and replaced will be free.

 

Software and hardware lifetime maintenance

Free upgrade software, the software is Reach and developed by ETON, so we support whole lifetime free upgrade updates.

 

Visit customers regularly and gather information

Visit clients regularly. We attend the different exhibitions in different cities every year, at the same time, we will visit local clients and support our service and collect feedback on customer suggestions in time.

 

Provide the latest information about technology and equipment

We give professional technology suggestions to our clients. And share the updated news with our clients

 

On-site service

We have some official site in India as Mumbai and New Delhi, also have site in Egypt, Turkey that can provide service timely with our engineers.

According to your needs, dedicated senior engineer will come to your factory for free install and training you how to operate the machine.

  1. What is your usual payment term?
  2. Our usual payment term is T/T, that requires to pay 30% in advance, and pay the balance off before the delivery of the goods.

 

 

  1. How  long is the machine maintenance period, whether it is free?
  2. The maintenance period of our machine is 1 year and its free for our clients, after the maintenance period we will arrange our engineers to check and test the machine one or two times a year freely.

 

  1. How long can the delivery date take?
  2. If have stock the delivery date is about 20 days, others is according to the actual situation.